Owner: Puget Sound Energy Inc. Legal: N half of SW 1/4 of NW 1/4, Section 36, T24N, R7E (Tax Account 362407-9091-04) Documents found: 7

Recorded Type Recording # Pages Description PDF
2008-02-29 Warranty Deed 20080229000792 2 PSE acquires parcel from Lake Alice Plateau Associates (Conner Homes joint venture) for $3,370,000. The main substation parcel. Subject to exceptions in Exhibit A including ingress/egress easement (Rec# 6703497). PDF
2008-06-25 Survey 20080625900015 2 Record of Survey (same as parcel 9030).  
2011-02-02 Agreement 20110202001508 118 Pre-Annexation Development Agreement (PADA). The foundational agreement between PSE and City of Snoqualmie for the Mount Si Substation. Governs development standards, zoning, mitigation, and SE Douglas Street extension. Includes 14 exhibits with maps, legal descriptions, Covenant and Easement, vegetation management rules, and Wetland Mitigation Plan reference. Full PDF
2011-04-14 Warranty Deed 20110414000323 1 SE Douglas Street ROW dedication. PSE to City of Snoqualmie. Dedication of street right-of-way as required by PADA Section 6.1.4. (Partial download; full document is 4 pages.) PDF
2011-04-29 Covenant and Easement 20110429001446 69 City of Snoqualmie Covenant and Grant of Easement (same as parcel 9030).  
2011-12-28 Agreement 20111228000526 3 Developer Extension Agreement (DEA). PSE and City of Snoqualmie. Relates to SE Douglas Street construction and surface water dispersion. Signed by Mayor Matt Larson and PSE’s R.S. McNulty. (Partial download; signature and exhibit pages only.) PDF
2012-05-07 Easement 20120507001193 3 Surface water dispersion easement. PSE grants City easement for storm water dispersion trenches (two 70-foot strips, 1,400 sq ft and 328 sq ft). Includes Exhibit F: template for future termination of easement upon completion of SE Douglas Street extension. References PADA. (Partial download; exhibit pages only.) PDF
2012-11-09 Partial Release 20121109001597 1 BPA partial release of right-of-way (Tract APP-1-A-5). Releases BPA’s interest in a portion of the parcel under the Contract and Grant of Easement (Document 20010410000791). Reserves rights under the 1967 Transmission Line Easement (Instrument 6173180). BPA Case File 20130022. PDF